lack of expertise in Flexible Packaging Capex Project Management
lack of dedicated resources for such project
critical challenges of unpredictable costs and timelines
semi-optimum material flow
underspecified infrastructure
wrong assets installation
missing Masterplan drawings
poor supply contract preparation
high commissioning waste
and at the end under performing machinery and increased waste
Whichever Flexible Packaging technology you want to invest we can help you to:
Prepare overall concept of investment including:
Specifications (machines, building, infrastructure)
Masterplan drawing to visualize factory after investment with new material flow and infrastructure
Time and cost estimates
Business case preparation
and after your investment decision:
Collect and compare offers with performance guarantees
Accompany you in reference visits and machine trials
Prepare and negotiate contracts
Prepare required infrastructure
Organize Factory Acceptance Tests, delivery, installation, training and commissioning
All of above with professional Project Management giving you control and visibility of entire project.
lack of know-how and resources for relocation project
receiving site assessment and preparation
infrastructure expansion requirements
relocation process (disassembly and assembly)
machine transport
CE recertification
necessary upgrades, modifications or retrofits
operating manual translation
know-how transfer coordination
ang give you peace of mind
Prepare overall concept of assets relocation including:
Assessment of relocated assets (in case of 2nd hand purchase or between 2 factories relocation)
Specifications of necessary adaptations (relocated machines, building, infrastructure)
Masterplan drawing to visualize factory after relocation with new material flow and infrastructure
Time and cost estimates
Business case preparation
and after your relocation decision:
Collect and compare offers from relocation providers
Accompany you in reference visits
Prepare and negotiate contracts
Prepare required infrastructure
Organize machine relocation, installation, training and recommissioning
All of above with professional Project Management giving you control and visibility of entire project.
lack of trained resourced capable deliver savings projects
lack of expertise in:
Lean and 6σ methodology
Flexible Packaging technologies and processes
high setup and production waste
low OEE
long setup time
poor processes
lack of standardization and operational KPIs
high Cost of poor Quality
expensive Claims
and save substantial amount of money
6S - 5S + Safety
Daily stand up meetings
SMED workshops
Kaizen events
Kanban
Standard Operating Procedures and One Point Lessons
PDCA, root cause analysis and problem solving techniques
Value Stream Maps
Operational and Quality KPIs recording and monitoring
and many more
disturbed supply chain due to machine break-downs
long machine down-time
lack of Preventive or Predictive Maintenance
high cost of maintenance
repeated break-downs
frequent infrastructure failures
missing defect reporting
manual maintenance logs
expensive spare-parts stock
unutilized and untrained staff
and generate long term sustainable savings
Machine and infrastructure health check audit
Setup of Preventive and Predictive Maintenance system
Computerized Maintenance Management System implementation
Repeated Failure analysis and prevention measures
Maintenance cost reduction program
Maintenance KPIs setup
Maintenance technicians training program
Spare parts cost optimization project
and many more

with Cieslinski Consulting
© 2025 Cieslinski Consulting - All Rights Reserved,